For window replacement with timber boards in Bury, the technical sequence begins with thermal junctions, so we coordinate the frame perimeter with insulated reveals or cavity details to limit avoidable cold bridging, with thermal junctions kept as the lead check for this timber-board reveal windows scope. We then use final checks to coordinate board depth, frame setback, end returns, seal line and decoration, and we open, close, lock and inspect each installed window before the work is handed over, with thermal junctions kept as the lead check for this timber-board reveal windows scope. Before closure, sill level is reviewed and we coordinate the frame base with the internal sill or window board and the external weathering detail, with thermal junctions kept as the lead check for this timber-board reveal windows scope. The handover also covers packers; we support the frame at suitable points so fixing does not pull it out of line. Together these checks support timber internal boards aligned neatly with the replacement frame and reveals.