For fixed-pane windows in Long Eaton, the technical sequence begins with trims, so we coordinate internal or external trims with reveals, frame position and adjoining finishes. We then use frame position to coordinate frame dimensions, glass size, sightlines, drainage and perimeter sealing, and we set the new frame at a position that works with the reveals, sill and external finish, with trims kept as the lead check for this fixed-pane windows scope. Before closure, packers is reviewed and we support the frame at suitable points so fixing does not pull it out of line. The handover also covers internal sealing; we close the internal frame perimeter cleanly before trims or making-good work is completed, with trims kept as the lead check for this fixed-pane windows scope. Together these checks support fixed glazing with a clean frame line and no unnecessary opening hardware.